Other pipeline realizations
- Construction of the water transportation system from deep wells to the waterworks in the former Kondrad copper mine area in Iwiny. Works extended to, among other things, filling the preexisting ø 500 waterway with PEHD pipe ø 315x18,7 PE 100 and 4.0 km long, filling with cement mass between the ø 500 and PEHD ø 315 pipe, laying 531 m of PEHD ø 315x18,7 PE 100 pipeline in an open dig.
- Execution of 9 km drinking water pipeline ø 280 PEHD from Bolesławiec to Iwiny along with a container pump room.
- Installation of 2 km of PEHD ø 900 pipeline in Głogów.
- Modernization of pipelines and execution of drainings for the Żelazny Most reservoir.
- Rain drainage renovation for POL-MIEDŹ TRANS LTD.
- Execution of water pipelines supplying cooling constructions for ventilator station engines for KGHM Polska Miedź Mining Plant Lubin Branch.
- Execution of postfloatation slime reservoir ZB1 with indispensable infrastructure for KGHM Polska Miedź Hydraulic Technology Plant Division.
- Modernization of R-3 and R-4 on the road from the Ore Enhancement Plant Polkowice to the slime camshaft chamber in the Rudna Główna Area.
- Installation of 2.5 km of pipeline as part of the “Drinking water management modernization” for for KGHM Polska Miedź Hydraulic Technology Plant Division. And, for the same client, the company executed a renovation of 0.5 km of pipeline in the Brzeg Głogowski area.