Client: KGHM Polska Miedź S.A. Copperworks „Cedynia” Division
Technical data:
Entire installation placed in a hall, measurements:
length – 60 m
width – 20 m
height – 13 m
This industrial investment included the construction of buildings and installation of devices essential to introduce and operate the UPCAST US36X-15 assembly line for production of copper rollings from high-conductivity anaerobic copper. Assembly line casing was installed under Finnish supervision, and the works run in difficult winter conditions demanded swift execution.