Environmental installation

    Client: KGHM Polska Miedź S.A. Ore Enrichment Facility

    Works extent:
    The investment included execution of the following elements: sulphuric acid deposit, lime milk assembly expansion, deplastering floatation and main floatation of modified waste sections along with acid-proof tray and railway casing and cart-rolling device.


    Works were executed during normal operation of the ore enrichment facility, thus in order to shorten the work span it was decided to raise the existing ceiling construction with hydraulic cranes from level +13.23 m to +15.83 m.

    Prace wykonane były w trakcie normalnego ruchu zakładu produkcyjnego wzbogacania rud, dlatego w celu skrócenia terminu realizacji zdecydowano o podniesieniu istniejącej już konstrukcji dachowej przy użyciu dźwigów hydraulicznych z poziomu +13,23m na +15,83m.