Sungai Kelinchi Tunnels, Perak Han Joog - Malaysia

    Client: Universalbau, Perak Han Joog
     
    Technical data:
    First tunnel length – 370 m 
    Diameter – 3 m
    Second tunnel length – 40 m 
    Width – 8.7 m
    Height – 7m

    Technology:

    Tunnels made in the traditional mining method.

    PeBeKa, as the subcontractor of Universalbau company has executed a water dump tunnel for the Sungai Kelinchi reservoir, and a year later a hydrotechnical tunnel along with technical working for the Perak Han Joog Cement Plant. The execution of this task has been severely hindered by not only the geological and technical conditions, but also the site location – in deep jungle, 120 kilometers from the nearest settlement.

    Geographical position