Har Gilo Long Tunnel - Israel

    Client: Rotem Development Ltd.

    Technical data:
    Tunnel length – 900 m
    Diameter – 3 m
    Cross section – 70 m²

    Technology:

    Tunnel was drilled with the NATM method. Final case was made in shotcrete with steel fibers.

    As part of the contract the company executed the road tunnel Har-Gilo, 900 m in length, on the road from Jerusalem to Bethlehem. During the completion of this task, two distinct drilling techniques were used. From one side the rock formation was drilled mechanically using a light hydraulic hammer, and from the other explosives were used.

    The construction of this tunnel, nearly a kilometer in length, was the first contract the firm acquired without the mediation of the foreign trade center.