Ankaray Project - Turkey

    Client: Bayindir- Yuksel Joint Venture
     
    Technical data:
    Total tunnel length – 2,341 m
    Cross section – 31 m² to 105 m²
    Total number of piles – 3,094
    Jet-grouting – 13,542 m
    Length of reinforced tunnel section – 150 m


    Technology:

    Tunnels executed with the NATM technology, using roof bolting, steel lining, shotcrete and final concrete. As a method for fast rail tunnel reinforcement in the river valley area, jet-grouting was adopted.

    In Turkey’s capital city of Ankara the company built tunnels for fast city railway. The total length of constructed one-track tunnels was 2,264 m, and two-track – 77 m. During the tunneling, the company was obligated to design and execute parts of the tunnels in the old river valley with many layers of water-bearing gravels and sands. This problem was solved with the use of jet-grouting technique consisting of high-pressure cementation of rock formation around the executed working.

    Geographical position

    All rights reserved

    PeBeKa